ii
ii
Parts:0
Yield:—
Waste:—
💰 Saved:
Projects
Sign in to manage projects, or create a new one!
Settingsi
Unit i
Blade kerf imm
Default — override per material in the library.
Sheet supply i
Quantities are treated as available stock.
Optimization goal i
Minimize leftover material (default)
Enter stock prices to minimize cost — otherwise the plan is optimized by waste.
Kerf tolerance (±) imm
Start trim imm
End trim imm
Profile width imm
Trim per side i
leftrighttopbottom
First cut direction i
Calibration cut i
mm
Max. cutting stages BIZ i
Minimise rotation BIZ i
Speed vs density i
Densest plan — the full search (default)
Min. offcut imm
Min. reusable size i
×mm
mm
Currency i
Cost per cut i
Saves kerf tolerance, start/end trim and cost per cut as your defaults for new cuts.
Custom fieldsi
Stock sheets
ii
📐
Click here, then Ctrl+V from Excel
Name | Width | Height | Qty | (Price) | (Material)
| ★ | Name | Material | Width | Height | Qty | Material price ($/m²) |
|---|
Stock bars
ii
📏
Click here, then Ctrl+V from Excel
Name | Length | Qty | (Cost) | (Material)
| ★ | Name | Material | Length | Qty | Material price ($/m²) |
|---|
Wood stock
i
🪵
Click here, then Ctrl+V from Excel
Name | Qty | W | H | Length | (Cost) (mm)
Dimensions: mm
| Name | Material | W | H | Length | Qty | Material price ($/m²) |
|---|
Parts (2D)
i
✂️
Click here, then Ctrl+V from Excel
Name | Width | Height | Qty | (Cost) | (Selling price) | (Material)
| ● | Name | Material | Width | Height | Qty | Rot. | ⚑ | EB | Price/pc | Selling price |
|---|
Parts (1D)
i
📏
Click here, then Ctrl+V from Excel
Name | Length | Qty | (Cost) | (Selling price) | (Material)
| ● | Name | Material | Length | Qty | ⚑ | Price/pc | Selling price |
|---|
Parts to cut
i
What sizes of pieces are needed
✂️
Click here, then Ctrl+V from Excel
Name | Qty | W | H | Length | (Cost) | (Selling price)
Dimensions: mm
| ● | Name | Material | Width | Height | Length | Qty | ⚑ | Price/pc | Selling price |
|---|
Offcut inventory Free account🔒
Reusable material pieces from previous cuts.
Material inventory Free account🔒
Material inventory — save and reuse your standard material sizes
Nesting options
Stock sheets
📐
Click here, then Ctrl+V from Excel
Name | Width | Height | Qty | (Price)
| Name | Width | Height | Qty | ⛔ |
|---|
Exclusion zonesi
| Name | X | Y | W | H |
|---|
Parts
i
✂️
Click here, then Ctrl+V from Excel
Name | Width | Height | Qty | (Cost) | (Selling price)
| ● | Name | Qty | Rotation |
|---|
Results
Cutting Sequence
—
Cutting SequencePROCutting sequence requires Pro plan
Enter materials and parts
Fill in the data, then click Run Optimizer.
A sample project in one click — see how a finished cutting plan looks.
🎁